Got the bike back at home now, some space to lay things out, wiring is my issue so will plod through and see what I can do with it. Lots of small jobs ahead...
Made a little progress in the last few weeks but nothing complete... wires hanging out all over the place...
I now have the tins primed (no it’s not going to be white, that’s just primer) looks heaps better with some colour....
Still a little weld to do here'n there, chain guard, lid for electric box etc...
Also built a box to put the bike on, makes it easier to work on for sure, no back issues...
Wires everywhere, have all the stainless and some alloy off for polishing, internal wired the bars and sunk in some buttons for a minimal look, will find a particular master cylinder to replace the HD one but until then will grind off the flange and tidy up what I have...
No comments:
Post a Comment